Avi Learner.

P.530-19 / ADDITIONAL BOUNDED PROCEDURES

More mechanisms.
The same explicit limits.

Explore diversity, cross-polarization discrimination, rain and wet-snow, and outage calculations separately. Each result keeps its exact inputs, equation trace and conditions.

Research software, not the full P.530 implementation or an operational assessment. Source ambiguities, missing dependencies and invalid cases remain blocked. A formula result is not a service guarantee, ILS distortion estimate or airport-safety conclusion.

02 / REVIEW THE EXACT CALCULATION

Result & conditions

Choose a method and enter inputs. Nothing has been calculated.

Export saves inputs and declarations, never computed results. Editing any input removes the preview and applied result.

Boundaries that remain

  • Route comparison entries are explicitly selected nonofficial mathematical assumptions. Their spread is not a confidence interval. Literal source diagnostics are not probability predictions; the original parallel-route conformance question remains unresolved.
  • Optional local current-edition climate lookup is available on the verified climate-files page. No automatic real-airport geometry or OEM defaults.
  • Annual, worst-month and period-specific statistics remain distinct. Components cannot be added unless the selected equation's common basis is explicitly established.
  • Outage sums use supplied qualified components and do not turn unassessed effects into zero.
  • Parallel-route source inconsistencies and engineering/field validation remain unresolved. P.676 covers uniform terrestrial gas; P.526 includes the general sampled terrestrial-terrain method, with explicit sampling, ground and spherical-model limits. No result establishes every propagation mechanism.

Primary reference: ITU-R P.530-19

ASSUMPTIONS AND REMAINING LIMITS

Notes before using this model

  1. These are conditional research procedures for fixed terrestrial line-of-sight links, not operational clearance. Supply geometry with a common AMSL height datum, material properties, equipment signatures, a common BER criterion and the statistical period required by each selected method. Check the selected method’s exact input bounds and result trace.
  2. Source-policy extensions require separate explicit opt-ins: source-suggested space diversity starts at25km, while combined space/frequency diversity still starts at30km and retains its2–11GHz carrier limit. Source-expected multipath up to45GHz requires grazing line-of-sight evidence; it does not extend diversity to45GHz.
  3. The finite-fade option removes only the100dB software cap. Deep-fade, probability, numerical representability and other source conditions still apply. These extensions are not additional measured validation; strict methods remain available.
  4. Nonofficial parallel alternatives use explicitly selected coordinate/covariance and standard bivariate-normal assumptions. Literal parallel-route Eqs93, 94 and 97 remain unresolved; diagnostics are not joint probabilities, and invalid source branches remain withheld without fallback.
  5. Sampled terrain and reflector planning cover supplied points and declared cases, not unsampled obstacles, automatic site identification or universal tower optimization. Source-qualified inputs and engineering design decisions remain external prerequisites.
  6. No all-effects mixed-period availability is calculated. Rain annual probabilities, worst-month clear-air outage and fixed gas loss remain separate unless a specific supported equation defines their combination.