WHOLE-CANDIDATE SOURCE AUDIT
What is implemented.
What still has a gate.
All 73 source locators are reconciled with this candidate. A parent heading, manual equipment input and conditional formula are not three completed models. This is an implementation map, not a percentage or operational clearance.
Complete-model acceptance remains open. No publication approval follows. Parallel-route Eqs93–97 have unresolved probability/geometry conflicts. Some source dependencies and end-to-end workflows remain bounded. Mathematical reproduction, physical applicability and professional acceptance are separate checks.
How to read the map
- Bounded calculation: a source-based numeric procedure exists within the stated assumptions.
- Guidance: organizing or engineering judgment, without a unique automatic answer.
- Dependency subset: only explicitly listed idealized cases are implemented.
- Workflow gap: component arithmetic does not yet close the named design workflow.
- Source blocked: no defensible complete numeric result is emitted.
Real terrain, material properties, equipment signatures and measured climate are legitimate inputs. Missing real-world records do not justify inventing defaults. Source empirical ranges are different from narrower software limits.
Full source map
| Source | Method | State and scope | Open calculator |
|---|
Official P.530-19. Exact source identifiers are preserved; raw recommendation text and maps are not redistributed.
ASSUMPTIONS AND REMAINING LIMITS
Notes before using this model
- This is a source-coverage map for fixed terrestrial line-of-sight research calculations, not certification that every real link or every physical effect is solved. Section counts are not completion percentages.
- Bounded arithmetic, source guidance, prerequisite data and full engineering workflows are different states. Terrain sampling, refractivity, material measurements, radio signatures and design choices must be supplied and checked for the actual link.
- Literal parallel-route Eqs93, 94 and 97 remain source-blocked. Nonofficial parallel alternatives are separately named assumption comparisons, not a repaired ITU method or evidence that the true result lies between versions.
- Invalid source branches and unresolved numerical cases remain withheld. Explicit source-policy opt-ins and dependency subsets retain their own applicability limits; a successful component calculation does not remove another component’s blocker.
- The map does not establish all-effects mixed-period availability, field validation, regulatory acceptance or operational clearance. Read the individual page notes and result trace before using any output.